22 07 29 015 BBQ Oakwrights Primary Hero

Our heritage

Company carving chisel on plan Galllery

Tim's Story

Our story

Nestled in the rural countryside of Herefordshire, Oakwrights has operated nationwide and abroad since 1999.

Like an acorn to an oak, we have grown from six employees to 147 during the past 25 years. We are now established as one of the leading oak frame building companies in the UK. While we strive to improve efficiencies by investing in advanced technologies and continual staff development, we remain true to our roots as a family-focused passionate company.

Our heritage and vision for the future

Our story

1999

Oakwrights’ story begins

Our story begins as Nick Price joins Tim Crump with the idea of setting up an oak frame house building company.

1999 1 Galllery

2000

Investing in our architectural practice

Terry Rutty is appointed as our first Architectural Designer. We invest in 3D CAD software to help bring the architectural design process to life for our customers.

9a8337eea13b5891d041000a4ff96fff 1024x768 1 Galllery

2001

The Lakes

The Lakes: Operations are moved to Tim’s childhood home in Swainshill, Herefordshire. The house is converted into office space and the first Oakwrights workshop is constructed. A 100ft x 40ft space is created with an overhead crane to make the movement of oak easier.

65afbf5133ca290b907f5e20e8661a39 1024x768 Galllery

2002

Building on our solid foundation

We invest in a Hundegger K2 CNC joinery machine, the first of its kind to be brought into the UK. We also add four Dietrich’s software packages to produce the machine files to run the K2.

Darren Blackwell joins as an architectural designer, expanding our design team.

111b0b05ea9b08698bccfd01b06d6f38 1024x768 Galllery

2003

Bill Keir joins as general manager. Bill was one of the original early carpenters who helped to re-introduce oak frame carpentry into the UK. He also brought a tremendous depth of knowledge to the team from working on and directing some of the UK’s most prestigious oak frame projects.

Pete Tonks and John Williams further strengthen the architectural team, adding their individual styles and character to our designs.

3a4832d5c25911e00a45d336f015986a Galllery

2005

We start renovating a two-storey old barn next to the main office. This gives us additional space for the growing design team and allows us to create a training programme, so we can recruit two new trainee frame designers each year.

C921d43ad24fb7b075da38717bc3d369 1024x631 Galllery

2006

Roland Horwood is appointed as frame design manager and implements the oak frame designer training programme.

We gain a full patent for our 3i infill panel system, along with TRADA certification, which means the traditional panels can be used on NHBC projects.

D4c701d0d97e85acc0977175f5f7ab0b Galllery

2007

Our show home, The Woodhouse opens its doors, allowing clients to experience an oak frame first hand.

We begin creating a new larger machine workshop on an adjacent site to the main office, to meet growing demand. This allows two 80ft overhead cranes to be installed for lifting and moving, making production more efficient.

A new Hundegger K2i beam processing machine is also commissioned.

Show Home 18 43 b E pso uncoated Oakwrights Lydia Harper Feature

2008

We win the Homebuilding & Renovating ‘Daily Telegraph Award’ for Best Traditional Design for a house in Norfolk. We also win the Sussex Heritage Trust award for our Richard Hope project.

554 038 b Oakwrights Darren Chung Content Block

2009

We appoint our first lead panel designer to create a dedicated team to manage panel design.

Cst2239bck Galllery

2010

Our 3i panel system gains industry recognition at the Homebuilding & Renovating Self Build and Product Innovation Awards, taking top spot in the construction systems category.

532 6 b Oakwrights John Perry Feature

2011

Our new framing workshop is complete. This is to carry out all carpentry operations and dry fitting oak frames. We install four 40ft overhead cranes, to help move oak around easily, and six dedicated framing stations to increase efficiency.

D89bc12235471544faa7201647b34fe8 Galllery

2012

We install two Weinmann butterfly turning tables to enable the clamping, squaring and build of 8m x 3m composite panels to enclose our oak frames. We also launch our new panel systems: WrightWall (wall/roof) and WrightWall Natural (wall/roof).

Our oak framing apprenticeship scheme has its first intake of carpenters.

2012 Galllery

2013

We complete a commercial project. Cams Mill, a Fullers pub and restaurant, sits on the site of an old tidal mill in Fareham.

Cams Mill 3 2 Fullers Brewery Content Block

2014

We complete our largest and most challenging commercial project. Pavilion One is a contemporary building that houses a Costa Coffee shop at the entrance of the old livestock development in Hereford.

We appoint a Building Regulations specialist and Certified PassivHaus Consultant.

Iain Hendry is appointed to respond to our growing presence in Scotland.

OLM MG 0676 Large Page Link

2015

Helen Needham is appointed as our first in-house Architect and Architectural Team Manager.

0092 b Helen Needham Oakwrights Web Staff

2016

We launch Oakwrights, GreenRooms division to respond to the growing demand for the design and construction of oak framed extensions.

Our ‘Oak Frame Homes’ book is published, to inspire anyone planning to build an oak frame home.

20 04 03 Oak Frame Homes 171 b Content Block

2017

The Oakwrights Portfolio is published, to inspire and assist clients selecting features for their own builds.

1734 4551 Oakwrights Dave Burton iuo b Content Block

2018

We launch our full turnkey offering, in response to the increasing demand for a full build service, and our custom build offering, which allows us to offer a dedicated service to small developers and landowners.

We begin building a larger workshop to house our softwood production equipment and panel making. The additional office space allows our frame design, projects and architectural design teams to work under one roof, which makes communication much more efficient.

2202 88 Oakwrights Mark Watts Content Block

2019

We turn 20 years old and rebrand to help strengthen our position in the marketplace.

Oakwrights Logo CMYK

2021

After nine years of working with Oakwrights, Charlie Mills is announced as our new Managing Director. Charlie joined Oakwrights in 2012 and since then has worked alongside all departments, before managing our Outbuildings and Extensions division. Now, Charlie is excited to drive Oakwrights forwards, while Tim Crump takes up the role of Chairman.

Passivhaus certification achieved for the UK’s second oak frame home and the first oak frame Bed and Breakfast in Worcestershire. This was an in-house project where our teams worked with our clients from the initial design stage, through the planning application process, to the momentous day when their bespoke oak frame and Natural encapsulation system was erected on-site, meeting the rigorous Passivhaus building standards. Please click here to read our clients’ amazing self-build journey.

Charlie Mills 027 Oakwrights b Content Block

2024

We celebrate 25 years

20240209 110426 b Content Block

ABOUT OAKWRIGHTS

Explore more about Oakwrights

Contact us

Want to discuss plans for your own oak frame project, organise a visit to our workshops, book a stay in our show home or just gain some advice? Please get in touch.

STAProtek singleNa CSBA 2024 OAK
© Copyright Oakwrights 2024
Company reg: 03713116 ‎ • ‎‎‎ VAT reg: 7210134 00